Answer Posted / ravikumar
yes
Is This Answer Correct ? | 16 Yes | 5 No |
Post New Answer View All Answers
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
what is anchorage length,lap length and (dont remember the last one)
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
what is constat for brickwork
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
can i get hindi version of is codes based on civil engineering?
Explain what is structural frames or systems?
How much of the strength of concrete comes from post- production curing?
yasser arfatcompleted his degree in civil from which university
How much cement will require for 1Rmt Skirting laying
What is kn measurement?
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method