CALCULATE QUANTITY OF RCC COLUMN

Answer Posted / ravikumar

yes

Is This Answer Correct ?    16 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

1567


How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?

1414


How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?

2050


how to calculate the dry wt of sand and cement for a required design mix?for ex:M20

2117


what is anchorage length,lap length and (dont remember the last one)

1741






cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?

1893


what is constat for brickwork

1690


how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?

1344


can i get hindi version of is codes based on civil engineering?

3886


Explain what is structural frames or systems?

659


How much of the strength of concrete comes from post- production curing?

2652


yasser arfatcompleted his degree in civil from which university

1799


How much cement will require for 1Rmt Skirting laying

1892


What is kn measurement?

742


Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method

1176