Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

calculation of cement bags in 1:2:4 concrete mix

Answer Posted / anil raut

For 1 m3 of concrete (1:2:4)
for Required volume of concrete 1.00
Add extra for additional voids in concrete ( 25% to 35%)
0.35
Total qty= 1.35 Cum
Mix total (1+2+4) 7

Therefore Quantity of cement = (1.35/7) 0.19
Cum
Qty of Cement in bags = ( 0.19/0.03) 6.4 Bags say(7
bag)
Qty of sand in bags = ( 0.19*2) 0.39 Cum
Qty of Aggregate = ( 0.19*4) 0.77 Cum

Is This Answer Correct ?    39 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.

2504


a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula

1733


how i can tak Quantity of mortar in block work

2446


what is the difference between np2 and np3 concrete mix

2155


What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?

2678


how to calculate mivan shuttering matrial

1651


what is civil engineer greatest strength and weakness?

13949


what is flashing?

1223


what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same

2292


undistributed samples are obtained by

2450


Howmuch bend to be provide for 200/600 BEEM

1666


How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members. 

3413


When was the first motorway built in england?

1119


what pressure the NP2 class RCC pipe can sustain?

2753


how to calculate the dry wt of sand and cement for a required design mix?for ex:M20

2607