Cement (0.576*1)%13= 0.0443 m3
0.0443x1440/50=1.275 bags or
0.0443/0.0347=1.275 bags
Sand 0.128*4= 0.512 m3
aggregate 0.128*8= 1.024 m3
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
how many litres of enamel paint required for 5000 sft of site??
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
How to estabilish reinforcement Steel rolling margin for a building projects ?
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
what are the proper pipes for salt water line
what is the clear cover for shearwall?
States some of the commonly used commands in cad software’s?
What are the methods of measurement? Describe it shortly
what is flashing?
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
how much quantity of cement,sand and water required for 1 sq feet flooring work .
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
significance of specific surface area of particles?