Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the quantity of cement,sand and aggregate in
600*600*1600 mm in 1:4:8

Answer Posted / kiran basude

Total qty is 0.576 m3
Total ratio is =1+4+8= 13

Cement (0.576*1)%13= 0.0443 m3
0.0443%0.347=0.128 bags
Sand 0.128*4= 0.512 m3
aggregate 0.128*8= 1.024 m3

Is This Answer Correct ?    4 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is thumb rule for deep trench excavation

1860


What is braced excavation all about?

1204


Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet

2893


hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard

2156


Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????

2122


What is the outturn of Ceiling plastering

3445


What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.

2551


please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)

1869


What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?

2676


HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS

4731


what motivates you to do a good job

3281


what are the Task work of different labour.?

2683


how much cement and sand required for 1cum rr masonry

5075


procedure for preliminary selection of size of column of 5 storey building

3296


WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)

3517