what is the quantity of cement,sand and aggregate in
600*600*1600 mm in 1:4:8

Answer Posted / kiran basude

Total qty is 0.576 m3
Total mix is =1+4+8= 13

Cement (0.576*1)%13= 0.0443 m3
Sand (0.576*4)%13= 0.1772 m3
aggregate (0.576*8)%13= 0.3545 m3

Is This Answer Correct ?    20 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the Maximum %age of Steel in columns and beams ?

729


what is right & short method of measurement of slab&beam

1649


WHAT IS YOUR CURRENT SALARY

1683


what are the ffactors you considered choosing the course?

1699


what's the formula for calculate pcc for matt(45mm aggregate)?

2163






How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.

1796


questions with answers to face an interview of an civil engineer regarding RCC buidings

2167


What is portland cement

7130


Why is the use of granular sub-base in concrete carriageways not preferred, explain?

776


WHAT IS YOUR EXPECTED SALARY?

1632


if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column

1620


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

1663


What is Rankine Cycle?

669


How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?

1450


What is difference between engineering stress and true stress?

673