Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is meant by Anchorage length? Development Length?

Answer Posted / s p sharma

What is meant by Anchorage length? Development Length?
Ans: Both are same.

Is This Answer Correct ?    17 Yes 92 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

All aptitude question of Bechtel

1883


1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.

2295


how much required strength of cement concrete bricks(size 230x115x75mm)

1986


Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??

2387


how to calculate freeboard in under ground water tank and technical details

3396


Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?

2157


What are the types of slump?

1163


How do we determine the specific gravity of a cement?

1109


show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation

2149


Cement consumption of one cubic meter of aerocon blocks masonry?

4097


I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.

6078


how to calculate the strength of rebound hammer test reading in building construction ?

3357


Explain what is alternate bid?

1270


I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.

2261


What is the quantity of cement in mix m20 concrete?

1154