Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is CCTV System???Applications........

Answer Posted / l b lakhnotra

In current situation CCTV (Close circuit television) used
as below area
1. Power plant like high pressure and high temperature
steam drum for condition monitoring
2. Air port
3. Main road
4. Mega city
5. Steam turbine
6. Flameble area like petrol pump and LDO pump
7. Used for Prohibited to Enemy entry from border.
8. Port
9. Custom area
10. Chemical and processing plant.

Is This Answer Correct ?    46 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the best method of grounding in 30 MW generator?

1963


A 3-PHASE TRANSFORMER IS USED TO STEP-DOWN THE VOLTAGE OF A 3-PHASE, 11KV FEEDER LINE. PER-PHASE TURNS RATIO IS 12.FOR A PRIMARY LINE CURRENT OF 20A, CALCULATE THE SECOUNDRY LINE VOLTAGE, LINE CURRENT AND OUTPUT KVA FOR FOLLOWING.A)STAR- DELTA.B)DELTA-DELTA.

2988


Where is servomechanism used?

1121


What are the temperature elements?

1171


what is the differance between HT motors And LT MOTORS.

1919


what is the difference between surge protection capacitor and surge arrestor

2255


whatis the commertial spec. of distribution boards ?

2012


how we can explain arc heatng?

1859


what is the Pickup/drop off ratio in BCPU relays

4575


What is the difference between vector surge relay (78) and Pole slip relay (98G)

1149


Dear all, i completed M.E(Power Electronics & Drives) 2011 passed out having 78% so i need job in core side but i don't know how can i receive the calls from electrical companies and i uploaded my CV in naukri, times jobs etc.. In that iam not recieved any mails from good companies so give me best procedure plzzzzzzzzzzzzzzzzzzzzzzzz..... Thanks, K.Linga Reddy Email-id:-lingareddykmthm@gmail.com Ph no:-08015402078

1756


How to design harmonic filter at the project stage without nowing the harmonics levels

2170


hi, i have 3x200KVA and 2 x 80KVA UPS with battery bank of 150AH 68Nos. and 100AH 204Nos., i need to install AC either ductable or PAC type, so can you help me to calculate heat load and capacity of the AC to install.

2682


direction of tarbine& genrator

2037


do you have some of interview Questions in power and genrator section in general whith answers

2126