Answer Posted / u.prabhagaran
first cross checking,after change the element.
Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
what is the responsibility of an instrument commissioning supervisor
Im having problems with interfase betwen SPI v7.0 and SPPID v5.05. Previous versions of Intools shoul be fixed with SPPIDproj.ocx file. It was necessary to replace this file with one that allows the connection between different versions of SPPID. It is necessary in the current version to do the same?Thanks
What are the interlocks we have to check during the start up of LP/HP compressor?
Explain why plc require in analog input 4-20amp & 0-10 volt?
Why trim span ? How?
Galvanizing.
What is instrumentation control?
how pressure transmitter work, what is its principal to measure and how its generate signal. for pressure transmitterinstallation which precautions must be taken ??
For crude application in floating roof tank, how to calibrate a DP Transmitter? How is the floating roof weight considered?
any one can send me instrumentation previous interview papers? I prepare for MNC Company Interviews? my mail id- Rakesh.Golla@dodsaldxb.ae , and another mail rakesh.gvk@gmail.com
Draw a great bridge circuit.
what is the procedure for auto tune in masoneialn 12300 series displacer type transmitter?
what are the steps I have to deal with?
What are the types of control valves available
How to calibrate Field bus transmitter? procedure ?