what"s the formula to find the cement,sand,aggreegate(45mm)
requirement for PCC?
Answer Posted / vishnu soni
For 1 cum concrete 1:4:8, then we reqd following
quantities:-
1.54/sum of ratio
1.54/13= .11/.034=3.48 bags of cement
Fine Aggregate:-- .11x4=.44 cum
Coarse aggregate:-- .11x8=.88cum
Is This Answer Correct ? | 55 Yes | 18 No |
Post New Answer View All Answers
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
How many square meter can mason layout chb per hour
what are the Task work of different labour.?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
what is cement wastage percentage in NHAI ROAD WORKS
For the construction project what capital cost has to be taken in consideration?
whats is difference between anchorage length and development length
trapozidal
please briefly explain calculating or estimating steel quantity for a RCC column?
How much cement and water required for cement selery????
what is tension footing?
how to calculate testing date
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?