Answer Posted / raghavendra
capacitor start capaciter run type induction motor are use
in the
celling fan
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
Hi, My plant daily consumption is calculated as 3.8MWH but my supplier has sanctioned an power of 2.6MW per day. how can i equal or distinguish this two factors
to vary valtage from 0 - max a variac is necessary . so how to design for high power applications nearly about 200KW power
I HAVE A 50A MCCB AS PER DESIGN LINE WIRE CONNECT UPWORD SIDE AND LOAD IS CONNECTED TO DOWNWARD SIDE TO THE MCCB.IF NOW ANY ONE CHANGE SUPPLY & LOAD(WISEVERSA) WHAT HAPPENS ? DOES MCCB OPERATION OR WORKING FUNCTION NORMAL IF YES THAN WHY THERE ARE MARKED LINE & LOAD ON MCCB.
how we do Vector group ,magnetic balance and tap changer test in Transformer?
what is the difference b/w UHVDC and HVDC(LIGHT)?
How to calculate cable rating for 3 phase supply?
what is the minimum recommended leakage current of an earthed cable connected to the body or skid of an alternator
What is the formula for calculating impedance of transformers connected parallel at fault level 50KA?
How is efficiency of DG set calculated? At many places I found the efficiency to be mentioned in percentage. But at some other places I found kWH/ litres. I want to know how dimensionless percentage value is arrived at?
what is meant by star/delta voltages as 440/220 in a 3 phase induction motor, and why it should be connected on STAR IN 3 PHASE SUPPLY
How DC earth leakage currents can be reduced ?
I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE
hi , i have 150 kw loud and we need 50 m cabil,i want to know wich size cabil we use. thanks
Do u know any one? how to find out in motor rated amps? formula?
How to select the earthing transformer,for DELTA TO DELTA TRANSFORMER OR ALTERNATOR SIDE.Pls post your answers and calculation.