Difference between PLC and SCADA ?
What are merits & De-merits of PLCs ?
What are merits & De-merits of SCADAs ?
Answer Posted / bajrang ahirwar .jpl
PLC is Programmable logic control and basically used for
controlling of different systems .
SCADA is Supervisory Control and Data Acquisition system
this system collects data, keeps records, make real time
readings available and provides smooth control.
PLC is assosiated with only one ore two systems but SCADA
contrls a lot of independent PLC's on will of operator.
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
What is class ab operation?
What is Annunciation?
why we are using Load factor?
How can calculate the rating of a alternator for a given specific load with formula
how to generator maintenance (A Check, B check,Etc)
Single line diagrams for star to delta and DOL starters.
what is the AC Plant and how can do the work with parts and picture tell us 150 Tr
pre arcing time of ehv breaker
regarding safety what would u consider the most important rules to observe when inspecting electrical equipment?
What are the classifications of oscillators?
1.what is difference between ATS & STS main use. 2.what is difference between ACB& VCB With symobles,and main partes, manimum range. 3.How many types of relays and main function.
Minimum IR value of 1.1 kv grade 3.5c (300, 240,185,150,120,95,70,50,35,25) sqmm Aluminium XLPE cable and 4c (16, 10,6 & 4) sqmm cu arm cable between RY,YB,BR,RN,YN,BN,RE,YE,BE & NE.
why electron produce magnetic field when it is in motion?
how to identify the cable quality and what is flame proof cable
Why the power generated in dams is complex power? Why the generators in dams cannot produce Real power directly (i.e power which has zero reactive part)?