How to calculate cement and sand quantities in cement mortar
As 1:1,1:2,1:4,1:6 ?
Answer Posted / syed mahaboob hussain
the procedure to calculate quanity is given below
RATIO (1:6)
NOTE = 1:6: 0.55(Water) = + (7.55)
CEMENT = 1m3/7.55 x 1 = 0.132m3 (No of Kg = 0.132 x 1506 =
198.792kg)
Sand = 1m3/7.55 x 6 = 0.794m3 (No of Kg = 0.132 x 1650 =
437.250 kg)
Water = 1m3/7.55 x 0.55 = 0.072 m3 ( No of Kg = 0.072 x
1000 = 72liter)
| Is This Answer Correct ? | 20 Yes | 52 No |
Post New Answer View All Answers
what isload waring calculation
What is meant by Crystal Concrete?
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
What are the different types of runners?
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
what is pqc
detailed calculation of the amount of cement used?
how to identify np3 pipe and np4 pipe
Stringer How many cm goes to landind
I want to join bhel because
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
Did any of the egyptian pyramids ever fall down?
Pls explain me about tension and compression in a flat slab
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor