What is vector group? What is meant by DYN11?Why is it needed?

Answer Posted / earnest paul

It means that the LV winding voltage lags the HV winding
voltage by 30 degrees.
The 11 typically means 11 o'clock on a standard clock.
whenever you see a vector group like Dy11 ar Yd1 or Yd5 ...
all you have to do is first FIX THE HV WINDING AT 12 o clock
now the 11 shows that it is behind 12 on the clock so you
can say that the LV is lagging by....30 degrees
in Yd1, the lv windings is at 1 o' clock meaning it is
ahead of 12 o clock by thirty degrees so it means that the
LV winding leads the HV winding voltage by 30 degrees
in Yd5, the lv windings is at 5 o' clock meaning it is
ahead of 12 o clock by 150 degrees so it means that the LV
winding leads the HV winding voltage by 150 degrees

Is This Answer Correct ?    48 Yes 17 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

The sodium vapor lamp is not glows when it is connected a distance of 5 meters above from gearbox, why ?

3202


what is earth resistance? how to measured? and give values at power station and mcc area?

1511


state the disadvantages of carbon filament???

2369


What is meant by derating factor?

670


Compare salient pole and cylindrical rotor machines.

1451






i've iocl interview.. if you know the interview process please give me information..

1446


Earth bits close or open. Which is correct

1318


why capacitance effect is predominant in underground cable transmission and inductance effect is predominant in over head line transmission?

3189


What is the most accurate way of testing ELCB?ELCB is better than RCD?

2878


what are the safety measures of induction motor?

1582


If there is major % of Voltage harmonics in the system, how can it be control or reduced?

1565


Meter p.t. ratio= 3×230/400 , c.t.ratio = 3×1 (2) A what is m.f.

1324


what is p.s impedance measurement test in earthing transformer?

1844


what size steel armoured cable is required to support 1500kva capacity. would 70mm squared be enough or would I need 90 or 120mm squared 3c plus earth

993


I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE

1485