Answer Posted / purnima
First step to verify is the pole with three lights in all
4 directions.
Second step to be verified is wheather the li8ts are in
working condition based on the color required.
Third step to verify the order lights are placed on the pole
fourth step to verify the time difference between each
signal on all sides to be consistent.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
could any body plz let me know which is best training institute for telecome testing in hyderabad?
How many types of api testing are there?
whar are the contents in db testing test case template
how mapp the defect id in quality center?
What is the difference between load and stress testing?
What about manual testing opening in bangalore in September. Not getting a single interview call from last one month.
which sanity testing is performed?
What is Web testing & which action we take at the time of Web Testing?
Can you explain the workbench concept?
Can any body tell me in real time how cookies testing is done. And please tell me the steps.And for cookies testing test cases is needed.
how many modules in ur bank project? what functionalities r there?how did u check? could u plz expalin ur banking project?
Explain the procedure & path of s/w in testing?
What is difference between cmmi and cmm levels?
What is a failure?
what is entry and exit criteria and explain it?