the amount which paid to contractor before starting work.
what does it calls?
Answer Posted / n. makesh
Mobilization advance which will be deducted in running bill
| Is This Answer Correct ? | 13 Yes | 1 No |
Post New Answer View All Answers
What is the difference between yeild strength and compressive strength of steel???
Which type of plywood & sizes using in construction projects ?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
What black man invented the clothes dryer?
What is the strongest bridge for a school contest?
what is stressing
Advantage of Aluminum form work in terms of activities can be skip and cost too
How much cement,sand,bricks and water needed for 1square metre brick work?
what does the grad of cement shows (denotes)?
how to do sudoko puzaals?
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
Is there the dry coefficient of cement is constant?