the amount which paid to contractor before starting work.
what does it calls?
Answer Posted / kumar
Mobilization advance
| Is This Answer Correct ? | 18 Yes | 1 No |
Post New Answer View All Answers
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
Rate analysis of Vitrified tile in cement mortor 1:3
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.
All aptitude question of Bechtel
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
how to create our resume?
How does siphoning work?
hi guys what happens if you are absent for a supplymentry exam?
may i know the detailed description of cutting length
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
What is the quantity of cement in mix m20 concrete?
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
questions with answers to face an interview of an civil engineer regarding RCC buidings