I Have concrete mix with 440kg opc and having 37 mpa
strengh in 7days while in 28 days only 42mpa can anybody
tell me the reason for the same.
Answer Posted / teerath singh
Mix Desgin in carrect
| Is This Answer Correct ? | 2 Yes | 5 No |
Post New Answer View All Answers
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
How to take labor charges for construction of 1cum of concrete?
Ratio for 4500 psi concrete
How do you calculate the power of a centrifugal pump?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
what is that one cub metre plaster in cemant and fine sand
What is command line?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
how to calculate valuation for the old building?