We are the following testing process start with 'test
initiation' during the test initiation my project manager
select required testing factors based on projected
type,project requirements,scope and risks involved in the
project.After completion on test initiation my test lead
prepare a test plan which includes "what to test",How to
test","When to test","Why to test".After completeness of
test plan my test lead perform reviews for its completeness
and correctness .After finalization of test plan linke us
tester prepare a test case for module after teceiveing the
build from developers.We start execute corresponding test
case manually or using automation tool whenever required
during test case execution i found mismatches i will report
to the developer above tha mismatches.After receiving the
modified build from developers i perform regressing testing
on thhat modification build after execution of all
responsible on that results we put the test close review
for the complete ness and correctness of the test reviews.

Is This Answer Correct ?    7 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

An engineering college wants to automate their examination activities to speed up their work and maintain high-end accuracy of information. A brief overview of the proposed system is given below: The proposed examination system is consisting of 8 semesters spread across 9 branches (assume your own branch names) and spans over a period of 4 years. Each student belongs to a branch and must register for a minimum of 6 courses but not exceed 8 courses maximum. The scoring pattern for each course is given as below: Maximum marks for each course: 100 Pass: 35% Distinction: 70% and above First class: =>60% and <70% Second class: >50% and <60% Pass Class: >=35% and <50% The proposed system computes the result and announces the results every semester. The results must be accurate and all examination records will be maintained till the students leave the college. Develop a Test Strategy to test the proposed system. Your Test Strategy must include the following: • Test Plan • Testing Methodology to be followed • Test cases • Test effort estimation • Test Correction Mechanism Note: If you need more information on the requirement specification, you are permitted to assume along the same line but clearly specify the details.

4278


Does any one have Performance test plan and Security test plan? Please help me as i need it ASAP... Thanks in Advance.

1842


How do you document well a website (i.e an ONG website) pls help me with a sample. Need your help UR

1825


Can someone give checklist to test the performance of application. This checklist to be provided in the Test Plan that the following will be tested, e.g. 1. n users will be tested to test the load 2. Per page load time would not be greater than n seconds etc. I want to know the points other than the above stated ones.

1941


write test case for ecomerce shopping

2297






How To write Wimax field testing test cases,,,,? both negitive and Positive,,,,follows rule Tringulation (Logitude and latitude)

3201