Answer Posted / asfaq
Hello my name is asfaq
and i have only one
dream to go bombay
and any type of work
in bollywood like
assistant director or
and any types of
scence belive me i dont
have any influence so
what can i do to go and
fulfil my dream
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
How much cement and water required for cement selery????
How is make concrete cube?
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
What is pre-stressed concrete?
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
punj loyed and sapurjl palanjl
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
What is the distance between railway tracks?
how much one carpenter can doing shuttering of slab in one day
what is called Bulk Density of aggregate?
What is the yield of 100 litres of water and 10 kg of cement in grout mix?