What letter follows after these, O, T, T, F, F, S, S, E, __?
Answer Posted / anish khatri
n for nine
| Is This Answer Correct ? | 27 Yes | 1 No |
Post New Answer View All Answers
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
What do you understand by “preset” during the installation process of bridge bearings?
What are your future hopes for this job?
what is tension column?
What is the distance between railway tracks?
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
will fix foundation bolts at site with out template is there any procedure?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
What is the method of soil replacement test?
how to caluclate sienerge qty in construction in ap
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
important question on stones
What is the Hardness of M-40 grade concrete, general and theoratical
What are the alternate material for steel, Sand and aggregate
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.