If I have 3 different process chains then how can I create
a Metachain including all these 3 local chains ? Step by
Step procedure would be much appreciated as I am going to
try the suggestions provided on system. Thank you.
Answer Posted / ola oladute
Use event-controlled processing to automates all the 3
local chains as follows:
1. Use t-code SM62 to create an Event
2. Go to SM36 to create a job
3. Click on start condition, give the start date and time
of Process Chain no. 1
4. Create the job using program BTC_EVENT_RAISE. In the
variant give the event name as A
5. Include the event A in step 4 in the start condition of
PC (Process Chain) no. 1. Also include a program that will
raise event B
6.Include event B name in the start condition of PC no. 2.
Include a program that will raise event C
7.Include the event C name in the start condition of PC no.
3.
8. Go to SM64 to trigggered the event
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
What is ?User master comparison? in roles?
How do you do EURO conversion at the database level?
Is it possible for the users to convert the package group into a process chain? If so, how?
What are the do?s and don?ts?
How to fetch the data from sap-r/3, sap-bw/bi to informatica system? what is step by step procedure? at what senario you retrieve the data from sap system to informatica or say dwh system? --
what are the drawbacks of cubes?
What is the transaction to maintain services?
Which datastore object is used?
What is a validity determining characteristic?
When you compressed multiple requests, how would you know which had ?marker update? enabled or not?
What is ?filling? of aggregate?
How the mapping is done in bw?
What is a control query?
How dashboard is created in sap bw?
What is 1 ROWCOUNT key figure?