Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many winding in the single phase transformer?

Answer Posted / rahul deo maurya

there two
primery and secondry

Is This Answer Correct ?    10 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the difference between CT/PT operated Meter and RRAMR Meter for HT/LT application?

2603


How to calculate cable rating for 3 phase supply?

2186


DIFFERENCE BETWEEN NORMAL TRAFO AND THRISTER TRAFO?

2613


What Is HO factor in power selection

2074


What is meant by Low Resistance Cable and High Resistance Cable.

1910


what is load vs Torque curve & why it is used?

2071


how to measure earth resistance of a substation

3323


Can anyone provide with a SLD for HT panel installation for a 33KV line and distribution end has three 1.5MV transformers. Is it suitable to use OCB or VCB and also provide me the suitable rating and its connection diagram.

3352


State kirchoff current law?

1086


What tests should i carry over on a newly rewinded DC Generator with voltage rating of 38 volts and current rating of 350 amps, to certify that the machine is OK?

1882


5- What is the task (function) of the excitation and isolation transformers in power plant? 6- What is the task (function) of LCI (A), LCI (B) and LCI (COS) in power plant? : LCI (A) and LCI(B) are load commutating inverter for generator turbine starting. , LCI (COS) is load commutating inverter change over switch

3816


I am about to write exam in RRB bangalore for the post of section engineer.please provide me with previous exam questions

2146


hi frenz,its aswathy.i hve aplied for the hpcl test on feb,pls send the test patern & the placement papers as soon as possible. mail-id :kjaswathy@gmail.com

1784


how to select the mpcbs and contactor for 3 phase 30 hp star delta motors.for plc control.and tell me the calaculation for future use.

1968


How can two 3 phase transformers of same KVA and Voltage be connected in parallel?

1893