Answer Posted / thiyagan
M20-M means mix proposition and 20 means compressive
strength of concrete at 28 days.
fe415-fe means yield strength of steel 415N/mm2
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
What is different between DI Pipe and CI pipe?
how to calculate the size of triangular ring in rcc column?
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
What is command line?
what is floating slab foundation?
whats is difference between anchorage length and development length
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
How much is the cover for slab?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
How to arrive dry volume of concrete (1.52 to 1.57) ?
Draw the cross section of a boundary wall and label its part with detailing?
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?