Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is m & 20.&
what is fe&415.

Answer Posted / thiyagan

M20-M means mix proposition and 20 means compressive
strength of concrete at 28 days.
fe415-fe means yield strength of steel 415N/mm2

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is different between DI Pipe and CI pipe?

2152


how to calculate the size of triangular ring in rcc column?

1806


I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.

2037


What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster

2307


What is command line?

1185


what is floating slab foundation?

1198


whats is difference between anchorage length and development length

1872


How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton

2120


How much is the cover for slab?

1289


Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

2711


I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,

1993


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

3046


How to arrive dry volume of concrete (1.52 to 1.57) ?

2346


Draw the cross section of a boundary wall and label its part with detailing?

4620


In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?

2091