hi,
how would i run job1 then job 3 , then job2 in a sequence of
job1 ,job2,job3.
Thanks
sunitha
Answer Posted / nannesaheb
First We can Create the job sequence for Job1 and Job3 then
set the scheduling time first,then we can create the job
sequence for Job2 then create the sequence as required
format then run the job. then we should get required result
----Nannesaheb
8807423181
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Highlight the main features of datastage?
what are the errors,warnings in datastage
What can we do with datastage director?
DB2 connector> transformer > sequential file Data will be exported into a csv format in a sequential file. This file will be send in a email using a sequence job. Problem here is, how to avoid sending a blank csv file? When I ran the job there are chances that it might return zero records but in the sequence job csv file is going blank. how can I avoid this? thanks
How to manage date conversion in Datastage?
What are the different layers in the information server architecture?
What are some different alternative commands associated with "dsjob"?
file having these input and we have to get 3 output using same job Input 1 1 1 2 3 4 4 4 o/p1 o/p2 o/p3 1 1 2 2 1 3 3 1 4 4 4
whom do you report?
Describe the architecture of datastage?
Hi All , in PX Job I have passed 4 Parameters and when i run the same job in sequence i dont want to use those parameters , is this possible if yes then how
What is the purpose of pivot stage and types of containers in datastage
How to Remove Duplicate using SQL?
What is the project in datastage?
What is aggtorec restructure operator?