How is Grounding or Earthing achieved in Planes and
Automobiles?
Answer Posted / arup
In the case of an aeroplane, the structure is likely to
become charged during flight, particularly in atmospheric
conditions adjacent to thunderstorms. Airport procedures
include earthing the plane upon arrival, by attaching an
earthing cable to the fitting provided on the aircraft.
This conductor returns the aircraft to local earth
potential and discharges any static, an important
consideration prior to refuelling activities.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
How to do cable earhing? whether by grounding Armour to ground or by running extra G.I wire along with cable? which one is preferred mostly amoung them? If the second one is more preferable how many GI wires to be run along with cable (1 or 2)?
Why do we perform an open-circuit test and short-circuit test on the transformer?
What descriptive information does the NEC require to be marked on all conductors?
calculate external resistance values to add to the rotor of a slip ring induction motor. STATOR- 415 V, 3 phase delta, 1100 A, 50 Hz, 1490 rpm, pf 0,86 ROTOR - 660 V, 590 A, 50 Hz. STATOR current at each steps STEP1-600A,STEP2- 800A,STEP3-1000A,STEP4-1100A.
Write a note on Treatment for electric shock.
how to find Harmonics and types as per the equipemnts
WHAT IS MEANT BY INSULATION CLEARANCE IN VACCUM?
how define the torque in ac drive. from electrical side in the drive friquency ,voltage and current three factor is there.
What is the function of NER and NET?
Why different Pressure switch used in marine boiler water circulation system
What are the main significances of root locus?
what is the Earth Voltages in Power Plants, Sub-stations, Industries, Residential & Commercial Buildings.
How to decide cable tray size?
what is resver in electrical enginnering with answer
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.