Answer Posted / s.venkatesh naik
the shear key is nothing but provision for increasing the bonding B/W two successive concrete generally old concrete to a new concrete
Is This Answer Correct ? | 15 Yes | 5 No |
Post New Answer View All Answers
How is the strength of cement measured?
How to plan a project
What are the steps involved in the concreting process?
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
Consumption of Binding wire for fixing of cover block in vertical surface
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
Why are separation membranes used between concrete pavement slab and sub-base?
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
how to design and calculate materail quantity for concrete speedbreaker ?
is concealed wiring a problem in fly ash brick wall?
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
crank types
Slump Values for works?
Are cruise ships built for the transatlantic run?
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters