Answer Posted / s.venkatesh naik
the shear key is nothing but provision for increasing the bonding B/W two successive concrete generally old concrete to a new concrete
| Is This Answer Correct ? | 15 Yes | 5 No |
Post New Answer View All Answers
what is the water cement ratio for plastering
List out some of the software program that can be useful for architect?
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
Form where IS456 is adopted in 1978?
What are the problems one might face while having a Cantilever balcony?
What is meant by a context menu in a cad software?
residential projects,structural.
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
How is calculate the cube molt
Which are the top apps for you civil engineer?
What is componsation
How can I make justification between using concrete grade c35 compare c37?
what is the dimensions of river sand truck trailer or trolly ?
strength of bitumen concrete with 80-100 & 60-70 grade bitumen