Answer Posted / s.venkatesh naik
the shear key is nothing but provision for increasing the bonding B/W two successive concrete generally old concrete to a new concrete
| Is This Answer Correct ? | 15 Yes | 5 No |
Post New Answer View All Answers
How to find CN by using arcgis 9.3?
How to calculate quanty of steel in four leg stirrups?
What are the composition of a landfill?
whats is difference between anchorage length and development length
What is Grid floor and mention its advantages ?
Formula for calculating the volume of bulb in underreamed pile
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
Please design 12.5m long dubbly beam
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what is the difference between np2 and np3 concrete mix
Explain the different types of building contracts?
What is reinforced concrete?
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN