what is minimum dimension for the kitchen & bed room

Answer Posted / vishal kakade

9.5m squar

Is This Answer Correct ?    8 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

1822


What is the difference between shear and tensile strength?

669


if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.

1588


What are the strongest shapes in building?

672


psc girder detail

2728






Exterior Joints,define

1541


why development length = 50D . why not 100D

1486


how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????

1454


What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?

2242


what is the criteria for the finalisation of pavement thickness in road project?

1597


For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.

1605


what is c4x light weight cement blocks

5160


pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

2516


it is a corrected question." make a list of engineering property(properties) of soil.

1604


how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

2052