Answer Posted / k.prakashchandra
Add OLTC cables also. You can call it junction box for all
cables to and from Transformer
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
can indirect loading be called as phantom loading?
what should be the no load current for 3 phase ac motors ranging from 5 kw to 1000kw?
what is the interrelation between voltage current torgue speed and magnetic flux in case of different types of electric motors
explain different losses in a transformer.
best manufacturer for busbar for outdoor switchyard having double bus bar scheme, can any one share technical specification of busbar. 132kv voltage ?
hi....I am from india..i have completed my engineering in electrical and electronics field with 58.4% and my IELTS score is 5.5 bands....Recently i received my I-20 in computer and information science from Troy university in Alabama.On 18th i have a visa interview can u please tell me what type of questions i have to answer ??????
Electronic circuit
how to calculate distance between busbar supporters for LT panel, what are the factors influencing in this design
what is the method of earthing of a transformer using electrodes?
what is the physical connection of a analog i/p to a analog i/p module (ab plc)and through a analog o/p module(ab plc) to a analog o/p . and how all the process control by scada
What will be advantage if we put some load in neutral of grounded star transformer & loadshortcircuit current,rated current of cable & MCB with example?
What is the settings of distance protection relay in 400 kv line
What is the principle of HIGH SPEED DIRECT DRIVE MOTOR ?
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
what is the principle of operation of tungstun bulb ??