If I have a motor of 1MW with 6.6kv, running at 35% load, how
can i save energy without reducing the load ?

Answer Posted / o.suribabu

WHY CAN T WE GO FOR VFD ;IF CAPACITY IS REQD IN FUTURE U CAN
HAVE A CHOICE TOO

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How Load Factor, Demand Factor, Diversity Factor etc best applied in designing an electrical circuit? Is it allowed to consider these factors in each and every panel in an electrical distribution system? Can any body suggest a good book for reference?

2465


either water sensor or flow meter,how we observe the water level, f any other equipment are in market ?

1427


Why slip ring ind. motor power consumption is low compare to induction motor .same 90 kw motor used same load output

1259


briefly explain principle of resistance welding

1422


Where is servomechanism used?

665






how to select the mpcbs and contactor for 3 phase 30 hp star delta motors.for plc control.and tell me the calaculation for future use.

1472


It is desired to flood light the front of a building 42 meters wide and 16 meters hig.Projectors of 30 degree beam spread and 1000 watt lamps giving 20 lumen/watt are availabl.If the desired level of illumination is 75 lumen/m and show a suitable scheme.Assume the cofficient of utilization, deprecitation factor and waste light factor are 0.4, 13 and 1.2 respectively.

2980


how can I calculate charging current of cable/overhead conductor? what is roll of voltage in it ?

3235


i've iocl interview.. if you know the interview process please give me information..

1455


working principles of cf lamp,incandescentlamp and f lamp?

1845


where we use the SFU & FSU?

1986


What Is Sampling?

784


Operation carried out in thermal power stations?

606


Dear Brother can u tell the proper size selection of cable & the fault level calculation of braker, busbar etc. pls mail me at azeemk30@gmail.com

1441


what is the correct method for the outdoor termination of 19/33 KV HT cable step by step?

1642