how many m3, mason should done per day if he going to build
4.5 inch brick work(partition wall)?
Answer Posted / nikul&
5SM/mason (for Partition wall)
| Is This Answer Correct ? | 0 Yes | 4 No |
Post New Answer View All Answers
Difference between lime, distemper and plastic emulsion?
PL.tell me about civil engineering questions with answer
sir how can we find the cement and sand required for making 4" drop
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
What is structural frames or systems?
what discoveries did you have in relation to your course?
What is the difference between tor steel and tmt steel?
What is the difference between yeild strength and compressive strength of steel???
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
how do you stabilize a waterlogged area in road construction
The mixture of different ingredients of cement is burnt at?
Slump Values for works?
what is polity
What are the applications of modulus of elasticity?