What is transformer tap changers please explain
Answer Posted / byd
i am working at Transformer factory as test engineer, tap
changer is the part of transformer's primary winding which
is use to balance secondary voltage, for example we
have transformer which feature are: 630kva, 33/0,400 kv,
and this transformer has a tap changer , transformer
primary voltage positions are like these
HV(v) Lv (v)
28500
30000
31500
33000 ....... 400 v
34500
36000
network voltage is 33000v but sometimes it can be
increase or decrease , you can change tap changer:)
but this for no-load tap changer for distrubition
ransformer, if it is power transformer you should use
load tap changer
| Is This Answer Correct ? | 9 Yes | 3 No |
Post New Answer View All Answers
What is knee point voltage?
how to calculate slip ring induction motor stator and rotor currents??
block diagram of 2 ups system connected in hot stand by mode?
I have c license but I don't know eligibility of Max Kilo Volts under the electrical licensing board.
whats the differece between Exd and Exe
How one may guess the direction from which the distribution line is incoming if there is no pole plate on poles?
Can double compression glands be used with regular cables?
Why i receive the GCU fault in my DG Sychronization panel . what all the factors considered for this fault .
solar inverters was not connected to the nuteral link .this nutwral possible to any other systems
surge tank, hrc fuse, earthing transformer, firm power objective type
What are the advantages and disadvantages of the ac motors?
is that a problem if i connect a single phase load to a secondry delta connected transformer but i get a neutral from other transformer i the system?
how to select electrical equipment such as fuse,dg,transformer,motor,msb,wire,cable as per the connecting load..please mention any books to design,take licence
As i want some model question paper in basic computer science and history please send me immediately sir
It is desired to flood light the front of a building 42 meters wide and 16 meters hig.Projectors of 30 degree beam spread and 1000 watt lamps giving 20 lumen/watt are availabl.If the desired level of illumination is 75 lumen/m and show a suitable scheme.Assume the cofficient of utilization, deprecitation factor and waste light factor are 0.4, 13 and 1.2 respectively.