Hi,
Can any one tell me what we will do after the marking and
releasing of standard price in product costing.
Sravan
Answer Posted / sun
Price update and the same reflects in the accounting view
of the material master.
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
Do you have any idea about Capacity Planning?
What are the t-codes for creating, changing and summarizing bom?
What is meant by payscale structure?
What are the keyfields found in mrp view 1?
What is alternative BOM, or diff between BOM group and Group BOM?
What are all the settings done for configuring the integration of pp with fico?
How the process time is calculated in a wc when both labour, machine categories exist?
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?
What are sequence, parallel, overlapping, splitting and where can we assign these
In om, how to get the details for a group of employees (ex.) Group of drivers in the organization?
Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?
What is testing & explain standard testing
In the monthly lot size proc, how to generate lot at the end of Period?
What do you mean by basic dates
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?