In protection core of a C.T. why Knee pont voltage is
greater than SLV and in metering its viceversa?
Answer Posted / khaleel
the main protection core especially ps class and backup
cores have higher saturation point that metering
core.....becoz they hav to handle large fault current..that
occur in faults..so its knee point will be about 600v..
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
how to calculate differential current when we testing differential relay..suppose we have 1000kw generator,630amp VCB,what value we should put /inject so that relay trip the VCB? PLLZ justify ur comment
how can I calculate charging current of cable/overhead conductor? what is roll of voltage in it ?
WHAT IS IEC? & WHAT IS BENEFIT TO PRODUCT FROM IEC?
What is the capacitance values of 132,220,400 & 765 kV current transformer
Explain in details how you would react to an unexpected incident when your supervisor or manager is not around to give instructions?
HI....HOW CAN BE MESARED THE VALVE OF NEUTRAL GROUND RESISTOR WHIC IS LOCATED AT SWICHGEAR ON GENERATOR SIDE....
Which type of air compressor is used now a days in the market. Keeping in mind of energy efficiency and maintenance points. Relevant documents may also be sent on mentioned email ids.
what is p.s impedance measurement test in earthing transformer?
placing earthing pit in pathway is correct or wrong??. placing earthing wireGI1/18 inside walls is correct or wrong?. explain!!!
what is metering cum synchronizing panel and how it is used?
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
what's the exact magnitude of current, flows through Neutral?
can i use 4 number of circuit breaker as single phase manual change over switch? if yes then how plz also send ckt diagram at nazimzamurad@gmail.com
what are the range of memory address in plc for L&T lx7 4A
We are designer please help me calculate the size of 11kv cables from step up transformer to M.V panel, total load is 5 mega watt distance 900 feet (used aluminum type cables) please provided formula for calculate the cable with example.