What are the entry criteria for Automation testing?

Answer Posted / gulshan

The ADTP has been signed-off by appropriate sponsor
representatives indicating consent of the plan for testing.
The Problem Tracking and Reporting tool is ready for use.
The Change Management and Configuration Management rules
are in place.
The environment for testing, including databases,
application programs, and connectivity has been defined,
constructed, and verified.

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

pls post the questions for qa position in factset

6366


Explain the difference between quality control and quality assurance.

619


Have you used any automation tools?

592


hey, i recently attended 2 interviews and they asked whether I used qamonitor of softsmith. any help on what it does?

1550


Why is it often hard for management to get serious about quality assurance?

564






What is basic block?

628


What is breadth testing?

585


Which institute in hyderabad is good for ETL testing? Please suggest

1899


How do you differentiate between priority and severity of the defect within the project?

582


a proj ws atarted and cloded within the second day why?it has good amt of resources.srs ws prepers and accepted by the client too.

1720


prepare functional requirements and design test cases for a given business requirement as follows(consider all the implicit requirements): A message portal is given,Login into that, check for any e_mail in inbox-if present reply,if not compose a mail and send it.

1653


What are the attributes of a good software qa engineer?

593


kindly guide me about inspection process with the requried roles in detail?

1510


How to generate swift message

4312


What are the contents in test plans and test cases?

863