Answer Posted / reshmi
stripping is the process of removing the formswork from the
cured conctere structure . usuallly its is done after 14
days after curing.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
how gradation of aggregates effect on slump of fresh concrete?
how much tempareture are required to make liquid state of pid leed
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
what is meant by shear center?????
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
what is labour consume factor in residential projects
Different sizes of Hollow blocks and its weight. Thanks.
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
Why you are leaving present job?
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.