Answer Posted / reshmi
stripping is the process of removing the formswork from the
cured conctere structure . usuallly its is done after 14
days after curing.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
How do You Maintain a structure after getting cube test of low strength.
Which brick is best for construction ,either fly ash or AAC BLOCKS
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
Why joints are provided?
Define absolute co-ordinates?
What is Density of cement, sand & aggregate ?
How many bricks are there in 100cft?
what is SDLC ?and write a 'c'program for to swapping the three numbers?
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
what is the water cement ratio for plastering
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
What ingredients with% found in ppc cement??
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
How much cement and sand required for 9"brick wall per square metre
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)