How Much span required for 1 sqm of shuttering(Beam & Slab)
Answer Posted / sumeet rathod
1.for 1 sq/m slab reqired = 2span @ .600c/c
2.for beam support vertical iron props are required always, 1st prop kept from column at a distance of .230 and than .600 c/c
Is This Answer Correct ? | 8 Yes | 5 No |
Post New Answer View All Answers
what is the difference between replacement of cement by groundnut shell ash
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
How do you calculate reinforcement weight of steel?
What are wooden shingles?
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
what is high type road and low type roads
What is Architect-Prepared Contract?
how statics is different from dynamics
How many pyramid in egypt?
If specific gravity of cement is less than 3.15 what is the cause?
Explain the importance of moment of inertia?
Describe the advantages and disadvantages of using plastic and timber fenders?