How Much span required for 1 sqm of shuttering(Beam & Slab)
Answer Posted / sumeet rathod
1.for 1 sq/m slab reqired = 2span @ .600c/c
2.for beam support vertical iron props are required always, 1st prop kept from column at a distance of .230 and than .600 c/c
| Is This Answer Correct ? | 8 Yes | 5 No |
Post New Answer View All Answers
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
The largest size of paper used in plotter to print the drawing made by Autocad .
which formula used for calculate the area of segmental arch?
where i can get material costs on weekly basis
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
Explain different types of rcc pipes.
can i get hindi version of is codes based on civil engineering?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
When was the first motorway built in england?
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57