if my 6 kva UPS gives 20 min. backup at 100 % load, then at
25% load what is the backup time?
Answer Posted / gopalakrishnan
50 minutes
for example let us take four fans at 100% load for 20 minutes.
100% load means 4 fans = 20 minutes
75% load means 3 fans = 30 minutes
50% load means 2 fans = 40 minutes
25% load means 1 fan = 50 minutes
Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
3. Differentiate between ultrasonic flowmeter and radar type flow meter.
hi,i am doing 3 year in electronic and instrumentation engineering. what type of aptitude questions will be asked in a core industries and how can i improve my skills in instrumentation?
What pressure results for a flow transmitter of range 0- 180t/h in the dcs and 0-301mbar in the field using square root extraction. Kindly also suggest formulae for the percentages 0,25,50,75,100?
I want to know the questions asked in ONGC interview(after being selected in the written exam) for Instrumentation branch.Kindly help.
how u choose thermowell lenght n pnumatic C/v size?
steps for installing orifice plate?
State bernoulli’s application.
hii my name is sujith...i am preparing for HPVL GET 2010... so ,,,pls help me by send any previous questions or material to my site.....(Msujith_12@in.com) thank q
what is the procedure for auto tune in masoneialn 12300 series displacer type transmitter?
Good evening all I need a small favour regarding reliance paper i wanna probable sample papers(e&i) of reliance. if any of u have any idea about dis then plz mail me back.i belongs to electronics and instrumentation engg.so i need e&i papers. thanking u....
What is standard procedure of manual mapping in Radar type level transmitter?
Hi, I am Newely Joined in Construction company instrument engineer? Any one can Plz tell me How can I advanced preparation for Releated Engineering and construction Documents?
Why trim span ? How?
can you provide me full detail about instrumentation in ONGC??
What is sensitivity in vibration probes..?