how do u move the code from development to production?
Answer Posted / tkdhar
We can copy Workflows from development to production from
Repository Manager. We need to change the name of
integration services while migrating the code. If the
mapping is already exists in the production that then we
may need to resolve the conficts as well.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How to create or implement slowly changing dimension (SCD) Type 2 Effective Date mapping in informatica/Flagging mapping in informatica/visioning mapping in informatica?
Where are the source flat files kept before running the session?
What is an unconnected transformation?
can you please explain me pre session and post session options?
What do you mean by enterprise data warehousing?
How do you load unique records into one target table and duplicate records into a different target table?
How many numbers of sessions can one group in batches?
is there any way to read the ms excel datas directly into informatica?like is there any possibilities to take excel file as target?
Can we get 1st record through Informatica(without sequence number).
Explain in detail scd type 2 through mapping.
Did u used latest transformations of 8.6.0? for what?
What is substr in informatica?
What is status code in informatica?
What are the validations that you can perform in oracle and in informatica ? Advance Thanks
Can I use same Persistent cache(X.Dat) for 2 sessions running parallely? If it is not possible why?If yes How?