if my 6 kva UPS gives 20 min. backup at 100 % load, then at
25% load what is the backup time?
Answer Posted / chandrasekhar
6 min.
| Is This Answer Correct ? | 1 Yes | 11 No |
Post New Answer View All Answers
How to calibrate H2s Dectector
How the warning lamp of a charging-system is activated ?
can anyone guide me how to get any of the previous year GAIL question papers? are they available? 0n 2nd august i have to take the written test.
if in a level tx height is given, how u calculate the ranges of the tx?
When doing a liquid seal on a differential flow transmitter , most of the time the sealing liquid will be heavier then the process fluid. For wich application will the sealing liquid be lighter than the process fluid if transmitter is mounted below the process line.
I am manjunath having exp in maintenance of chemical plants,know i want to do a design course INTOOLS,after doing design course can we get jobs in design field.sinve i dont have design exp..
principle of dead weight tester ?
What is first echo & echo window in radar type level transmitter?
how do calibrate the valves.. with clear manual
How hart protocol can be connected with control valves?
how to calculate control valve bonnet size?? or how to select its material?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
What is standard of DCS panel design?and what is step of DCS panel design?wiring and type of connector(screw or DB connector)
How the sizing of the analog signal cable is calculate?
pls give me presant awerness quistion and answer in my emailid.