Answer Posted / lokanatha reddy.r
7850kg/m3
Is This Answer Correct ? | 34 Yes | 2 No |
Post New Answer View All Answers
What quantity of 1.0 m3 bricks required?
Which is the direction for positive angle?
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
Which code is used for tor & tmt steel bar?
How do you calculate the unit weight of concrete?
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
define the strength
Why should you consider yourself fit to be hired by jindal steel.
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
How to construct a water sump in a rocky soil?