Answer Posted / amar
Its a process of lifting the precast concrete structure or steel product (Like Column, Beam or slabs). Their will be some hardware (anchors) or steel wires to lift those things.
| Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
Explain what is Critical Path Method (C.P.M)?
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
What is an ortho mode?
how to absorb to site basic corrections? which are the important correction?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
What is passive earth pressure ?
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
What do you mean by bond? What are the different types of bonds?
what is the Asfalt test?in road constraction..?
What type of tensile strength is handling by crank in beam? Thanks.
How can i do RCC rate analysis?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.