how much nails used in 1 sq m shuttering
Answer Posted / pravin
0.25 kg nail per sq meter
| Is This Answer Correct ? | 15 Yes | 12 No |
Post New Answer View All Answers
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
How many mortar required for Brickwork of 1 Cu.m works??
What is the tensile strength of wood?
will fix foundation bolts at site with out template is there any procedure?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
hi guys what happens if you are absent for a supplymentry exam?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
very simple or less time consuming formula for reinforcement calculation by moment
how to control PQI (Project Quality Index)
how many kg of 20mm, 10mm, dust available in one ton stone boulder
How to construct a water sump in a rocky soil?
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?