Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how much nails used in 1 sq m shuttering

Answer Posted / pravin

0.25 kg nail per sq meter

Is This Answer Correct ?    15 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25

2767


What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)

2481


How many mortar required for Brickwork of 1 Cu.m works??

1511


What is the tensile strength of wood?

1188


will fix foundation bolts at site with out template is there any procedure?

2627


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2135


the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none

2167


hi guys what happens if you are absent for a supplymentry exam?

1825


1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

2117


how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm

2108


very simple or less time consuming formula for reinforcement calculation by moment

1473


how to control PQI (Project Quality Index)

10853


how many kg of 20mm, 10mm, dust available in one ton stone boulder

1858


How to construct a water sump in a rocky soil?

2207


What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?