Answer Posted / shahid
it is the oldest branch or mother branch of engineering
field in which different types of constraction work such as
highway brigdes irrigation work are included in this & it
gives the idea about preparing the tendar contract for a
particular civil work it is known as civil engineering.
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
What is the development length given in pile?
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
How to construct a water sump in a rocky soil?
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
How to determine spacing of bars in slabs or beams
Where is the worlds longest elevator and how long is it?
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
How cracks in concrete can be avoided?
How much for the BRC lapping in full yield and half yield < and which table to get it ?