Answer Posted / balakiranm
In this model testing is conducted from
system requirements phase.
Verification: These r conducted from beg
-inning to end of the project.To ensure
r we developing right product (or) not.
EX:Reviews,static testing
Validation: Conducted after the code is
developed to check the developed product
is right(or) not.
EX:system testing,UAT, Dynamic Testing.
Testing = Verification + Validation
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
when database testing comes into manual tesing
How does quality control differ from quality assurance?
What Is risk Based testing?
could any body plz let me know which is best training institute for telecome testing in hyderabad?
How is ‘build’ different from ‘release’?
Tell me agile process in your company
Explain crud testing.
what is functional testing terminologies
name poneno dept sun 9894433467 computer This is the xls sheet a programs written to transfer this data into database write test cases and test scenario?
What a team leader will test first when s/he will get new module to test?
what is the general pattern of explanation of projects in interview, can u ans me plz.......... ex: online banking application
What is difference in between operating system 2000 and os xp?
1)can u tell me, what is the roles and responsibles for database tester in DB testing from requirement stage to UAT stage....2) what are the i/p documents he wants and who wil give the i/p docs. to DB tester.and tell me what exactly db test case means what?
What is verification in software testing?
Pls u can u r mail id to my personal mail id also if they dont want to give u r mail id n comman place