Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how quantity of much blocks, cement and sand is required to
complete 1sq.m of CC Hollow blockwork

Answer Posted / srinivas.maradana

if hollow block is measurment .200x.300x.15
9 blocks sand .2354 cement i:6 is 63 kgs

Is This Answer Correct ?    3 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is anchorage length,lap length and (dont remember the last one)

2145


What is Architect-Prepared Contract?

1128


A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx

1767


1:4:8 pcc calculation 591 cu.ft

2237


Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem

2701


what is the formula for Mass of cement grout (Dg)=???

2153


plz drive the formula d2/162.162 for the calculation of weight of steel bars????

38227


WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?

2168


What are the phases inspections are done by local authority while construction?

1171


door and window wood work calculations and different methods

2079


How do you compute volume of airflow?

1226


Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.

2353


i need gate exam civil engineering question papers with answers

2152


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1890


how to prepare site mix design

1910