What is the maximum allowable 'Silt content' in River sand
Answer Posted / prabu
maximum of 8
percent allowable
| Is This Answer Correct ? | 31 Yes | 22 No |
Post New Answer View All Answers
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
how much tempareture are required to make liquid state of pid leed
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
Define mirror?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
What happens to Load at yielding ?
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
Can we apply curing compound on ceiling (slab Bottom)
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.