actually dia of the bar reduce asper drawing spacing also
decrease that time so how to calculate the spacing of with
respect to changed bar dia?
Answer Posted / biswajit acharya
The area of reinforcement/area of c/s of one bar
and the maximum spacing requirment of code i.e s<3d
| Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
List out some of the checking’s, done at the completion of construction?
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
What is Refuse Area In High Rise Building ?
how clculate excavated or backfilling quantity by simpson's rule
what is the use of water bar in water tank and is this an extra item in estimate?
WHAT IS YOUR EXPECTED SALARY?
What is factor not to be taken in consideration in mix design?
what is civil engineer greatest strength and weakness?
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
very simple or less time consuming formula for reinforcement calculation by moment
Explain what is Critical Path Method (C.P.M)?
what is the difference between natural draught cooling tower and induced draught cooling tower
how to find out hard strata in bored pile when the DMC method adopted.
residential buildings,mixing of concrete,structural,construction material,site handling.