how did u understand business requirement?

Answer Posted / moorthy g

I'm working in Informatica support project:
In generally we say any new req. "ticket" Ex: INIT1113371
using this ticket no. we can able get the document through
remedy tool
and just go through the document and understand the
requirement. adding new column or remove column like that.
If we are removing any column means, first check it out
this column refered any table or not
after that only. we can remove the particular column.
adding new column is very easy. 1-1 mapping.
after finishing we prepare migration document. we will send
to customer for cutomer requirement.

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Global and Local shortcuts. Advantages.

1475


Explain constraint based loading in informatica

667


Explain in detail about scd type 1 through mapping.

599


Different qualification between a related rotate toward the sky and isolates look upward?

564


difference between informatica 8.1.1 and 8.6

3257






Suppose we have a source qualifier transformation that populates two target tables. How do you ensure tgt2 is loaded after tgt1?

636


Explain the etl program with few examples.

560


Why do we need informatica?

565


What are the prerequisite tasks to achieve the session partition?

722


What are the main issues while working with flat files as source and as targets ?

668


Why do you use Mapping Parameter and mapping variable?

1298


What is an Integration service in Informatica?

717


What is a transaction control transformation?

771


How can we handle two sessions in informatica?

627


What is meant by LDAP users?

703