What is the difference between forward scheduling and
backword scheduling???
Answer Posted / riti
See, when you punch a order system activated for the material and delivery date, and check that delivery date whether material will be available on the date or not. So system start checking delivery date backward in order to meet specified date is called Backward scheduling. If time length is fall beyond the order date the system automatically start for forward scheduling to calculate lead time.
Thanks
Riti
| Is This Answer Correct ? | 2 Yes | 8 No |
Post New Answer View All Answers
Does sap transportation management have load planning capabilities? : transportation management
Can anyone walk me through the process of what happened when you do the post good issue in delivery? Moment type 601, let’s take that as an example, what happened in SAP? Suppose 601-moment type is posted in SAP, what happened when you do PGI (Post Goods Issue) as any account happens and if yes then what kind of account posting happens. please tell me, after PGI is completed what happens?
how can I do (config)? if my product category like this 1 product brand exam 101 brand A, 102 brand B 2 product type exam 501 type water, 502 type resin my sale deal is every customer can buy mix product category if buy 400.00 each can get free goods 10.00 each from any product in mix cat exam customer order line brand type quantity 1 101 501 100.00 2 101 502 100.00 3 102 501 100.00 4 102 502 100.00 mean customer meet target can get free 10.00 each but customer can select material in mix category chot trinnamaitip
What is the data used in shipment scheduling?
What is workflow? Name the person who can assist you while configuring a workflow for a system.
Define the customer taxes in ovk3, you will maintain the tax code in customer master.
What are the parameters in fd32?
What is a company?
What happens after Post Goods Issue?
Mention what are the techniques available in delivery scheduling?
What are the different types of partial agreements available in sap sd ?
What are the user exits?
What are the configurations steps for packing?
How to maintain number ranges for sales document types?
Explain what copy control is and when copy control transition can be done? In what manner copy control transition can be done?