Answer Posted / shubha
Depending on the feature delivery in every phase of Project.
Ex> MAT (Sanity), Backward Compatibility, Feature,
Integration so on.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How to know that we have to use which tool for this project?
When a non-conformance is noted during these "reviews", what happens next?
Hi QA, Do any QA's give us the detail status of review happening during the entire life cycle (if templates includes it will be very useful for us) ?
What if there is not enough time for thorough testing?
What is Operational testing?
List out the roles of quality assurance engineer?
What is the test ware?
can 2 tier architecture can be change as a 3 tier architecture
What if the project is not big enough to justify extensive testing?
Dear All, Is MBA Graduates Eligible for Software Testing jobs? Thanks Ramesh
When we should continue testing?
What is the quality audit?
What is the difference between black box and white box testing?
What is a weighted Defect What is Defect Density
what is the difference between product and process based projects?